Deadline shown by the official record when checked: 29 July 2026, 09:00 (UTC+02:00). TED and the buyer’s procurement documents remain authoritative.

Official record

BuyerMěsto Chrudim
Official titlePŘÍSTAVBA A REKONSTRUKCE SPORTOVNÍ HALY CHRUDIM, II. A III. ETAPA
IdentifierTED 444155-2026 · internal ID P26V00000016
ProcedureOpen procedure · works · single lot
Estimated valueCZK 524,425,349 excluding VAT
SubmissionElectronic; Czech-language bids; variants not permitted

What the source says

The notice covers a new Sporthotel and connecting structure, reconstruction of Tyršův dům, a new parking house, sports-hall works, hard landscaping, greenery, and associated site networks. The listed networks include wastewater, stormwater, water connection, oil and fat separators, low-voltage distribution and public lighting.

The notice states a CZK 3,000,000 bid security, electronic submission, and evaluation by the lowest total tender price excluding VAT. It describes a single lot, not a framework agreement.

What suppliers should check

  • The corrected bill of works and procurement documents on the buyer’s procurement profile.
  • The required bid-security form and submission mechanics before the deadline.
  • Document-level selection criteria, named personnel requirements and contractual conditions.
  • Whether the full combined building, public-realm and utility scope fits the proposed delivery structure.

ContractLens analysis

This is a broad single-package works opportunity spanning building, parking, external-realm and utility work. That makes the public scope relevant to suitably structured construction teams, but it does not establish eligibility, capacity or likely award.

Limits and corrections

The selection criteria are sourced to the procurement documents rather than fully stated in the TED notice. The published estimate includes a reserved-change component; ContractLens reports the notice’s total estimate and does not infer a separate base-contract value. The notice is a corrigendum following a corrected bill of works and an extended submission period. Report a correction or source update.