Official record
| Buyer | Infraestruturas de Portugal, SA |
|---|---|
| Identifier | DR 17315/2026 · reference 10021206 |
| Procedure | Public tender · single lot |
| Base price | €2.4m excluding VAT |
| Duration | 720 days |
What the source says
The services concern engineering studies for capacity increase and requalification of the IC8 corridor. The notice requires professional-authorisation evidence under Portuguese Law 31/2009.
What suppliers should check
- Electronic submission is through ANOGOV; variants are not permitted.
- A 5% performance security is required.
- Award weighting is 50% price, 25% technical merit and 25% key technician or team.
- The notice marks the contract as suitable for SMEs.
ContractLens analysis
The professional-authorisation requirement and combined technical/team weighting make this relevant to established road-engineering consultancies and multidisciplinary teams.
Limits and corrections
The €2.4m figure is the official base procedure price. Detailed deliverables and qualification evidence remain in the procurement documents. Report a correction.