The official procurement source and tender documents remain authoritative.

Official source

Original official titleDCC Contract for Construction of the Coolock to Clontarf Active Travel Scheme Section 2 – Gracefield Road to Vernon Avenue
Source languageEnglish
BuyerDublin City Council
CountryIreland
IdentifierresourceId 8916766
ProcedureOpen
Deadline13 October 2026, 16:00 Europe/Dublin
ValueEUR 6,130,000

Boundary

EUR 6,130,000 is the official estimated value, not guaranteed expenditure, award value or supplier revenue. This procurement does not prove supplier appointment, contract award, delivery, implementation, operational use or realised outcomes.

Official source ↗

Verified opportunity overview

Dublin City Council is procuring construction of approximately 2.6 kilometres of active-travel works from Gracefield Road to Vernon Avenue. The official procurement workspace remains the controlling source for supplier decisions and current documents.

Current status and key dates

The opportunity lifecycle is open. The controlling submission deadline is 13 October 2026, 16:00 Europe/Dublin; status must be reopened before any later publication or supplier action.

Scope and deliverables

Dublin City Council aims to enhance the quality of life for its residents by developing an integrated Active Travel Network. This comprehensive network is designed to foster connections among individuals via pedestrian pathways, segregated cycle provision and other environmentally friendly transportation alternatives. The enhancement of accessibility and interconnectivity for people walking, wheeling and cycling within this network is anticipated to play a pivotal role in mitigating carbon emissions originating from transport activities. The Council’s objective is to augment the existing 40km network into a seamlessly connected 314km network spanning the entire city. The Gracefield Road to Vernon Avenue Active Travel Scheme is one of the projects identified under this initiative. Gracefield Road, Brookwood Avenue, Sybil Hill Road and Vernon Avenue have been identified as suitable roads for active travel measures. This scheme will deliver protected cycling facilities in both directions and numerous improvements for pedestrians over a 2.6km route along these roads, between the junctions with Malahide Road and Seafield Road. The scheme includes the provision of segregated cycle facilities, improved pedestrian facilities (footpath and junction upgrades), ducting, resurfacing, etc.. The scheme also includes the upgrade of seven signal-controlled junctions to improve pedestrian and cyclist facilities. The scheme comprises the following: - Reconfiguration of existing carriageway for inclusion of protected cycle lanes - Site clearance - Pavement works - Kerbs and footways - Traffic islands - Public lighting - Traffic signs and road markings - Drainage works - Traffic signals and ducting - Utilities - Landscaping and urban realm works - Bike stands - Temporary traffic management. For further information, please refer to documentation available to download from www.etenders.gov.ie; CfT ID 8916766. Please note that this project is subject to funding. This description is deliberately bounded to what the official public workspace states and does not extend unstated deliverables.

Lots and contract structure

Refer to the current official procurement documents. Complete lot schedules, quantities, specifications and allocation mechanics remain within the live procurement documents.

Supplier requirements

Refer to the current official procurement documents. Suppliers must use the official documents rather than this research brief to determine eligibility and compliance.

Submission and award method

The official procedure is Open. The submission deadline is 13 October 2026, 16:00 Europe/Dublin. The evaluation mechanism is Most Economically Advantageous Tender (MEAT). The workspace identifies directive 2014/24/EU (Classic). The workspace marks the procurement as above threshold. The clarification deadline is 29 September 2026, 16:00 Europe/Dublin. Tender opening is stated as 13 October 2026, 16:30 Europe/Dublin. An online expression of interest is required. Multiple tenders are not accepted. Tender validity is 180 days. These are current official submission mechanics; the procurement documents remain authoritative for response forms and eligibility.

Value explanation

The displayed value is EUR 6,130,000. An estimate is not guaranteed expenditure, supplier revenue, call-off volume or realised award value.

Amendments and status history

The public workspace should be checked for later clarifications, deadline changes, document replacements, cancellations, awards and other status notices before acting.

Supplier relevance

Relevant to suppliers qualified for the Coolock to Clontarf active-travel scheme Section 2 procurement under official eTenders resource 8916766. Relevance does not establish eligibility, capacity, selection or likely award for any specific supplier.

Procurement data limitations and missing details

EUR 6,130,000 is the official estimated value, not guaranteed expenditure, award value or supplier revenue. This procurement does not prove supplier appointment, contract award, delivery, implementation, operational use or realised outcomes. Missing facts are preserved as unknowns and are not inferred from comparable procurements, market prices or supplier assumptions.

Official sources and verification history

Primary evidence is the official procurement source at https://www.etenders.gov.ie/epps/cft/prepareViewCfTWS.do?resourceId=8916766, checked on 9 September 2026. The current official documents remain authoritative.