The official procurement source and tender documents remain authoritative.

Official source

Original official titlePower Output for OCGT Gryfino
Source languagePolish
BuyerPGE Inwest 27 sp. z o.o.
CountryPoland
IdentifierPOST/PGE/INW27/DZAK/00183/2026
ProcedureOpen procedure
Deadline7 August 2026, 15:00 Europe/Warsaw
ValueNot stated

Boundary

No estimated value is stated on the opened official summary. Detailed technical, capacity, contractual and submission requirements remain in the linked procurement documents.

Official source ↗

Verified opportunity overview

PGE Inwest 27 is procuring construction and assembly works for the Gryfino gas-block power-grid connection, including cable-line parameter monitoring. The opened official summary confirms the live competition and deadline but leaves detailed technical and contractual requirements to the procurement documents.

Current status and key dates

The official source was checked on 23 July 2026 and the record is published as open or continuing admission. The stated deadline is 7 August 2026, 15:00 Europe/Warsaw. The stated duration is Detailed duration remains in the procurement documents. Suppliers must recheck the live official workspace immediately before relying on status, dates or documents.

Scope and deliverables

Construction and assembly works for the Gryfino gas-block power connection, including cable-line parameter monitoring. Construction and assembly works for the Gryfino gas-block power connection. Power-grid connection infrastructure. Cable-line parameter monitoring.

Lots and contract structure

The opened official summary does not expose a reliable lot structure. Suppliers must use the current procurement documents before assuming a single package.

Supplier requirements

Technical capacity, grid and electrical qualifications, reference projects, personnel, financial thresholds, insurance and contractual requirements remain in the procurement documents and are not inferred.

Submission and award method

The official summary identifies an open procedure but does not expose the complete submission schedules, award criteria, weights or required attachments.

Value explanation

No estimated value is stated on the opened official summary. ContractLens does not infer one from the power-plant context or comparable grid works.

Amendments and status history

No separate amendment or corrigendum was identified in the official source opened for this report. That is not proof that no clarification, replacement document or later notice exists. The live official source and current procurement documents remain authoritative.

Supplier relevance

Potentially relevant to power-grid, high-voltage, cable, electrical-construction and specialist monitoring contractors able to work on major generation-connection infrastructure.

Procurement data limitations and missing details

No estimated value is stated on the opened official summary. Detailed technical, capacity, contractual and submission requirements remain in the linked procurement documents. Unsupported criteria, certifications, quantities, service levels and amendment claims remain explicit evidence gaps.

Official sources and verification history

Primary evidence is the official procurement source for POST/PGE/INW27/DZAK/00183/2026, checked by ContractLens on 23 July 2026. The official source URL is https://op.europa.eu/en/web/public-procurement/procurement-details/-/procurement/937c683a-c794-4057-bd90-86ba6264aec8. The live official record and current procurement documents remain authoritative over this report.